68. Creating project documentation of system which automatically inactivates motocompressors and degases the technological system after exceeding 40% of Lower Explosive Limit at the Gas Compression Plant Mirocin for Control Process
February 2010
67. Creating new explozymetric system at the Gas Compression Plant Jarosław I
February 2010
66. Delivery of new imported spare parts for the gas motocompressors GAZ-SYSTEM, Oddział w Tarnowie
December 2009
65. Project documentation of the modernization of central control systems of motocompressors GMVH-8 installed at the Gas Compression Plant Wronów
July 2009
64. Modernization of the detection system in Gas Compression Plant Maćkowice
February 2009
63. Maintenance repair of the automation of motocompressor 10GKNA Gas Compression Plant Jarosław II
January 2009
46. Assembly and start of a start-up system for motocompressor GMVH-12 no 5 Gas Compression Plant Odolanów.
October 2007
45. Altronic devices delivery Gas Compression Plant Odolanów.
August 2007
44. Explosive gas detection system for motocompressor GMVH-12 no 1-5 and Ariel no 6-7 Gas Compression Plant Odolanów.
May 2007
43. Crankcase set and diaphragm set delivery for motocompressor GMVH-12 Gas Compression Plant Odolanów.
February 2006
42. Suction antipulse cylinder modernization for motocompressor GMVH-12 no 1 Gas Compression Plant Odolanów.
February 2006
41. Heat treatment and soldering of 6 rotor wheels and 4 diaphragms for compressor 2 BCL 306/a Universal Turbomachinery Equipment UTE Sp. z o.o.
November 2006
40. Regenerated crankshaft delivery and replacement for motocompressor GMVH-12 in Gas Compression Plant Odolanów.
December 2006
39. Spare parts delivery for industrial gas system Operator Gazociągów Przesyłowych GAZ-SYSTEM Sp. z o.o. Tarnów Branch.
December 2006
38. Rebuilding of ignition system and fuel gas system compressor GMVH-6 in Compression Plant Lubaczów.
November 2006
37. Rebuilding of ignition system and fuel gas system compressor GMVH-6 and GMVH-4 in Gas Compression Plant Jarosław.
November 2006
36. Introduction of work point visualization for gas compressors GMVH-12
Gas Compression Plant Odolanów.
2006
35. Delivery of ignition system Altronic CD-200 for Biogas Man Engine
Horus Energia Warszawa
2006
34. Maintenance service, after the expiration of guarantee period, of the automation systems at the motor driven gas compressors GMVH-6, GMVH-12
Gas Compressor Plant Maćkowice.
2006
33. Maintenance service, after the expiration of guarantee period, of the automation systems at the motor driven gas compressors GMVH-8
Gas Compressor Plant Jarosław.
2006
32. Technical design, delivery, installation, adjustment of gentle start up devices for two air compressors SF-125 (power 45kW) in
Gas Compressor Plant Odolanów.
June 2006
31. Design of repair system AKPiA for motor driven gas compressors GMVH-8 in Gas Compressor Plant Wronów.
December 2005
30. Delivery, installation and start up of fuel gas valves GOV-10 and ignition system CPU 2000 for motor driven gas compressors GMVH-8 in
Gas Compressor Plant Maćkowice.
2005,2006
29. Delivery, installation and start up of fuel gas valves GOV-10 and ignition system CPU 2000 for motor driven gas compressors GMVH-8 in
Gas Compressor Plant Jarosław.
2005, 2006
28. Designing and installation of liquid regulation of driving engine's rotations in motor driven gas compressor's GMVH and GMVH-12 refrigerating machine's blower in Gas Compressor Plant Jarosław.
December 2005
27. Design and installation of liquid regulation of driving engine's rotations in motor driven gas compressor's GMVH and GMVH-12 refrigerating machine's blower in Gas Compressor Plant Maćkowice.
December 2005
26. Installation of data transfer system between the CIOG Maćkowice and the Gas Compression Plant Jarosław.
January 2005
25. Automation and control of the gas heating system at the
Reduction and Measurement Console Io at the Power Plant Rzeszów.
December 2004
24. Periodic inspections of the combined electro-hydraulic drivers SEHAZ at the
Reduction and Measurement Console Mo?cice.
April 2004
23. Automation and control of the gas heating system at the
Reduction and Measurement Console Io Nowa Starzyna
and at the Distribution and Measurement Console Felin.
August 2004
22. Preparation of instruction for periodic inspections of the motor driven gas compressors type GMVH-12
December 2004
21. Maintenance service, after the expiration of guarantee period, of the automation systems at the
Reduction and Measurement Console Hermanowice.
2003, 2004, 2005
20. Maintenance service, after the expiration of guarantee period, of the operator and monitoring console and of the emergency power supply system at the Compression Plant Mirocin.
2003, 2004, 2005
19. Maintenance service, after the expiration of guarantee period, of the automation systems at the low voltage switching yard at the
Gas Compression Plant Mirocin.
2003, 2004, 2005
18. Maintenance service, after the expiration of guarantee period, of the automation systems at the motor driven gas compressors GMVH-6
num 1, 2, 3 at the
Gas Compression Plant Mirocin.
2003, 2004, 2005
17. Maintenance service, after the expiration of guarantee period, of the operator and monitoring console and of the emergency power supply system at the Compression Plant Lubaczów.
2003, 2004, 2005
16. Maintenance service, after the expiration of guarantee period, of the automation systems at the low voltage switching yard at the
Gas Compression Plant Lubaczów.
2003, 2004, 2005
15. Maintenance service, after the expiration of guarantee period, of the automation systems at the motor driven gas compressors GMVH-6
num 1,2 at the
Tłocznia Gazu Lubaczów
2003, 2004, 2005
14. Maintenance service, after the expiration of guarantee period, of the operator console, control panel, communication cabinet and the emergency power supply system at the Gas Compression Plant Maćkowice.
2003, 2004, 2005
13. Maintenance service, after the expiration of guarantee period, of the automation systems at the low voltage switching yard at the
Gas Compression Plant Maćkowice.
2003, 2004, 2005
12. Maintenance service, after the expiration of guarantee period, of the automation systems at valves field at the
Gas Compression Plant Maćkowice.
2003, 2004, 2005
11. Maintenance service, after the expiration of guarantee period, of the automation systems at the motor driven gas compressors GMVH-6
nr 1...7 at the
Gas Compression Plant Maćkowice.
2003, 2004, 2005
10. Maintenance service, after the expiration of guarantee period,
of the operator and monitoring console, control panel, communication cabinet and the emergency power supply system at the
Gas Compression Plant Jarosław.
2003, 2004, 2005
9. Maintenance service, after the expiration of guarantee period, of the automation systems at the low voltage switching yard at the
Gas Compression Plant Jarosław.
2003, 2004, 2005
8. Maintenance service, after the expiration of guarantee period, of the automation systems at the motor driven gas compressors GMVA-10
num 1, 2, 3, 4, 5, 8 at the
Gas Compression Plant Jarosław II.
2003, 2004, 2005
7. Maintenance service, after the expiration of guarantee period, of the automation systems at valves field at the
Gas Compression Plant Jarosław I.
2003, 2004, 2005
6. Maintenance service, after the expiration of guarantee period, of the automation systems at the motor driven gas compressors GMVH-8
num 1...6 at the
Gas Compression Plant Jarosław
2003, 2004, 2005
5. Preparation of the "as build" documentation for the revamping of gas piping.Gas Compression Plant Mirocin:revamping of gas piping at the motor driven gas compressors, of control panel, providing measurements and automation systems at motor driven gas compressors GMVH-6 num 3 and GMVA-4 num 1 & 2, power cabinet for automation system.
December 2003
4. Maintenance repair of the automation system to control the motor driven gas compressor type GMVH-12 num 1 at the
Gas Compression Plant O/ZOG KRIO Odolanów.
March
2005
3. Maintenance repair of the automation system to control the motor driven gas compressor type GMVH-12 num 2 at the
Gas Compression Plant O/ZOG KRIO Odolanów.
December 2004
2. Maintenance repair of the automation system to control the motor driven gas compressor type GMVH-12 num 3 at the
Gas Compression Plant O/ZOG KRIO Odolanów.
September 2004
1. Maintenance repair of the automation system to control the motor driven gas compressor type GMVH-12 num 4 at the
Gas Compression Plant O/ZOG KRIO Odolanów.
March
2004